Contaminated / Flammable Atmosphere
Risks associated with contaminated or flammable atmospheres are identified, assessed and controlled in accordance with the following Action Steps and the Project Risk Assessment.
Contaminated or Flammable Atmospheres
Chemicals / substances identified as causing contaminated or flammable atmospheres on a Safety Data Sheet (SDS) shall be managed in accordance with the Hazardous Substance Risk Assessment . This shall ensure suitable safety documentation (e.g. SWMS, standard operating procedures as appropriate) are developed prior to works commencing for the safe use, handling and storing of chemicals / substances.
This shall include extraction and ventilation requirements for use of these chemicals / substances.
Mechanical extraction ventilation systems to be used in basements or other areas without natural ventilation when operating machinery.
Crystalline Silica Dust Generating activities
Crystalline silica generating activities and minimum controls include:
Use power tools to cut or modify engineered stone
Nil alterations of manufactured stone on site using power tools. Manufactured stone to arrive to site precut and ready for installation. Manufactured stone that requires alteration shall be logged as a defect and sent from site to be altered.
Excavate into sandstone, clay or granite
When excavating into sandstone, clay or granite dust suppression shall be used as a minimum. Vehicles with enclosed cabs fitted with high efficiency particulate air filters preferred.
Drill, cut or chase into concrete and brickwork
All drilling, cutting or chasing into concrete and brickwork shall use the Core Cut and Chase Permit.
HCA and Subcontractor SWMS to include as a minimum: wet methods to reduce airborne dust (e.g. wet cutting or polishing, water sprays during earthworks), local extraction ventilation either fixed at a worktable or on-tool (e.g. for mixing, crushing, milling, drilling or chasing), shadow vacuuming (e.g. during drilling), vacuum clean-up, no dry sweeping, dust not to be blown with compressed air, use of appropriate and fit tested RPE.
Cut bricks, pavers or tiles. Dry angle grinds on concrete or masonry. Jackhammer, scabble or chisel concrete. Clean up the dust and debris created by the above activities.
HCA and Subcontractor SWMS to include as a minimum: wet methods to reduce airborne dust (e.g. wet cutting or polishing, water sprays during earthworks), local extraction ventilation either fixed at a worktable or on-tool (e.g. for mixing, crushing, milling, drilling or chasing), shadow vacuuming (e.g. during drilling), vacuum clean-up, no dry sweeping, dust not to be blown with compressed air, use of appropriate and fit tested RPE.
Crystalline Silica Dust training
All construction staff in the ACT shall attend an accredited Crystalline Silica Awareness training course 10830NAT Course in Crystalline Silica Exposure Prevention.
It is a requirement of induction on an ACT building site that all workers being inducted have attended an accredited Crystalline Silica Awareness training course 10830NAT Course in Crystalline Silica Exposure Prevention and provide evidence of completion of this course at induction.
Outside of ACT, HCA staff may attend an accredited Crystalline Silica Awareness training course.
Exposure Monitoring Activities
Refer Health Surveillance, Exposure Monitoring, Hazardous Substances Action Step for establishment and review of exposure monitoring activities.
Silica dust generating activities shall not exceed the Workplace Exposure Standard of 0.05mg/m3 – 8 hour time weighted average. Where unknown generation quantaties exist, occupational hygienist to conduct air monitoring or real time silica monitor shall be deployed.
Disposal of Silica Dust
To prevent Silica Dust becoming airborne due to waste bags ripping etc, all silica dust wast shall be bagged and placed in a manner to prevent exposure eg separate to other construction waste via separate wheelie bin / separated enclosure etc).
Labelling – waste bins / enclosures containing silica dust bags shall be signposted “DANGER – SILICA DUST”
Storage of Flammable Substances
Ventilated storage and bunding as per Safety Data Sheets. Minimum distances between active ingredients to be considered when storing flammable substances. Placard and manifest quantities as per state / territory legislative requirements
Hot Works
Hot work includes grinding, welding, thermal or oxygen cutting or heating, and other related heat-producing or spark-producing operations. Examples include grinding, soldering, cable heat shrinking, welding, thermal or oxygen cutting or other naked flame or spark producing operations (e.g. mowing/slashing).
A Hot Works Permit shall be completed in accordance with the Project Risk Assessment when any one of the following conditions apply:
- hot work is being completed within a client or user occupied area (e.g. breaking through into an occupied or completed area such as an extension to the building services / involve retro fitting in a completed area / post occupancy work); and/or
- hot work in a high risk zone. A high risk zone is an area containing readily flammable material below, or within 10m of works, that cannot be removed (i.e. carpet and furnishings, cardboard, paper and packaging, dry grass, straw and litter, stored flammable gas or liquids, glues, cleaners, lubricants, oils, isolation paper, insulation, PVC plastic etc);
- hot work is likely to trigger thermal (heat) detectors or activate sprinklers and/or smoke detectors.
- Hot works is being completed during a total fire ban
Where the above conditions are not applicable, a permit is not required and the hot works shall be managed through safe systems of work including:
- SWMS,
- standard operating procedures,
- ensuring first attack fire fighting equipment is readily available.
Due to varying site conditions and rapidly changing work environments, hot works shall not be conducted anywhere on site, including inside buildings during periods of Total Fire Ban. Where possible, hot work activities should be conducted off-site in approved factory environments outside the construction environment.
In the situation where a hot work activity is deemed essential, advice can be sought from your State SQE Manager or National SQE Manager on whether an exemption from the local fire authority can be applied for. It is the responsibility of the Project Manager to remain informed about the local processes for applying for an exemption and whether this can be applied for during the entire fire season. It is the responsibility of the Site Manager to monitor weather conditions and stay informed of warnings in their area and communicate these changes to the workforce via the Prestart.