Crane Loading Bays (modular systems)
This Action Step applies only to Modular Loading Bay Systems. For Scaffold loading bays please refer Scaffold Action Steps
Project Risk Assessment
Project specific Crane Loading Bays shall be identified, assessed and controlled in accordance with the Project Risk Assessment. The Project Risk Assessment shall be used to assist in the development of safe systems of work including procedures for emergency situations.
This Action Step is specific to Modular Crane Loading Bays. For scaffold loading bays please refer Scaffold Action Step.
Modular Loading Bay Workshop
Hindmarsh shall conduct the Modular Loading Bay Workshop with the nominated contractor prior to commencing activities on site and to develop safe systems of work for the:
- erection, dismantle and relocation of the loading bay;
- prevention of persons falling and the management of falling objects;
Once the initial workshop has been completed the Modular Loading Bay Workshop is not required again unless the formwork supplier/installer changes.
Design Management
Design drawings shall be provided by the loading bay supplier. They should include as a minimum:
- Slab loadings (point loadings, uplift loadings, live and dead loads imposed onto the structures
- Details of structural support of tie-ins (strength of structure that ties / props are being bolted or connected to.
- Location assessed to minimise relocation
- Safe Working Load of platforms
- Specific erection sequence (when applicable)
- Specification of any fixings required (e.g. depth, size, shear strength, bolt type
- Detail method of structural tie in (i.e. propping, anchors, ties etc arrangement)
- Public protection requirements (e.g. Class A + B hoardings)
- Location of electrical conductors if applicable. A minimum of 4 meters must be adhered to during erection and dismantle near electrical conductors up to 33000 volts. Anything above 33000 volts, you must contact the electrical supplier authority to determine a safe system of work for the erection, use and dismantling.
Evidence shall be provided to Hindmarsh and kept on site, which verifies that the proposed loading bays (specific model number) comply and satisfy AS1657.
HCA Structural Engineer Assessment
The project structural engineer shall assess and provide a written sign off to HCA on the following items:
- Loadings on structure – dead loads, live loads and environmental loads
- Strength of structure capable to carry proposed loading bays
- Propping requirements
- Uplift / punch through protection requirements
Safe Systems of Work
A Modular Crane Loading Platform Workshop shall be conducted with the relevant loading bay supplier and installer in consultation with the HCA Structural Engineer. Mobile or tower cranes capacities shall be assessed and a Critical Lift Permit is required if they shall be operating in excess of 90% of their rated capacity.
An installation and dismantle SWMS shall be provided and shall include controls for falling objects protection and falls from heights protections during installation and dismantle. If harnesses are applicable, a Harness Permit shall be completed.
Installation shall be completed by intermediate / advanced scaffolder or basic rigger and above (SI, SA, RB, RI or RA). The subcontractor installation supervisor shall have sufficient experience in erecting loading bays.
Inspection Requirements
The following inspections are required for modular crane loading platforms:
- Initial installation inspection
- Monthly installation inspection thereafter
- Out of sequence inspection i.e. after any significant weather events (e.g. extreme wind events)
- Where hydraulic / electrical components are present, specific pre-use / function checks to be carried out prior to use (minimum daily when loading bay is in use) by workers inducted into prestart procedure / SWMS.
Inspections shall be carried out by Intermediate or Advanced Scaffolder or Basic or higher Rigger (SI, SA, RB, RI or RA) and inspection certificate issued.