Demolition

Demolition

Risks associated with demolition are identified, assessed and controlled in accordance with the following Action Steps and the Project Risk Assessment.

Project Risk Assessment

The Project Risk Assessment shall be used to identify, assess and control demolition activities in accordance with the hierarchy of control.  The Project Risk Assessment shall be used to assist in the development of safe systems of work including SWMS, licenses and Demolition Plans.

Demolition Work Plan

The Demolition Management Workshop shall be conducted prior to commencing demolition activities with the demolition contractor to identify potential hazards and develop safe systems of work and the sequence for demolition activities.  Safe systems of work shall be addressed and documented in the Demolition Work Plan and associated SWMS addressing applicable:

  • risk assessments;
  • building investigations and material surveys;
  • building structures, including adjacent buildings,
  • engineering reports; and
  • permits or services isolations.

Building Structures / Adjacent Structures

The Demolition Work Plan shall take into consideration the building structure, including adjacent structures, and identified materials in order to develop a sequence to conduct the demolition safely.  Elements for consideration include:

  • Protection of adjacent building structures stability and finishes
  • Noise and vibration impacts
  • Services interference
  • Access, egress and emergency planning including assembly point locations

Hazardous Substances

In accordance with the Project Risk Assessment Hazardous chemicals and material shall be identified, assessed and controlled in accordance with relevant legal requirements.  Refer to Hindmarsh procedures Asbestos and Health Surveillance, Exposure Monitoring, Hazardous Substances for further information.

Location of Services

The Project Risk Assessment shall be used to assist the identification and management of underground and overhead services on site.  The Services Isolation Permit shall be used to confirm isolations prior to commencement of demolition activities.  Electrical services, including works near electrical energised parts, shall be disconnected or made safe by a Licensed Electrical Contractor.

Before You Dig Australia (BYDA) shall be engaged to assist with services identification and location, visit the website https://www.byda.com.au.  The shall be completed prior to work requiring electricity to be isolated.

Falls Prevention / Control of Falling Objects

The Project Risk Assessment (Working at Heights) and the Demolition Management Workshop shall be used to develop safe systems of work to prevent falls from height and controlling falling objects.  The Demolition Work Plan and associated SWMS shall address the demolition sequence to manage:

  • protection of unprotected edges, penetrations and openings;
  • protective structures to control falls from heights and falling material; and
  • secure exclusion zones.

Exclusion zones shall be established and sign posted to prohibit unauthorised access to demolition areas and to control falling materials.  Only authorised persons involved in the demolition works that have been trained and inducted in safe systems of work are permitted to access the demolition areas.

Emergency Management

Safety documentation (e.g. SWMS, Plans, Procedures) shall address task specific emergency procedures and meet the minimum requirements of Hindmarsh Emergency Management Plan Standing Orders.  Procedures shall be documented and communicated to workers and evidenced with sign off.