Excavation
Risks associated with excavation activities are identified, assessed and controlled in accordance with the following Action Steps and the Project Risk Assessment.
Key Points

Excavation Flowchart

The Flowchart – Excavation is available as a guide to managing key excavation activities on site and develop safe systems of work in accordance with the below requirements.
Definitions
Excavation:-The process at a construction site of cutting and removal of parts of the earth’s surface involving quantities of soil or rock to another location by either mechanical or non-mechanical means. This may include:
- Topsoil excavation (removal of the first layer of soil)
- Bulk (earth and rock) excavation (footprint of building, basements and cut and fill)
- Detailed Excavations (i.e. footings, pits, pads)
- Trenches (a narrow excavation where the depth of a trench is greater than its width)
- Direction Drilling (the practice of controlling the direction and deviation of a augur to a predetermined underground target or location)
- Piling (augured and driven)
- Ground Penetration Works (the process using force to insert/drive an object into the ground i.e. star picket)
- Non-Destructive Excavation (the process of excavating typically with high removing high pressure water and vacuuming of waste soil).
- Hand Excavation is the process of excavating by non-mechanical means using wooden hand tools i.e. shovel, hand pick for potholing, or doodling.
Service Location is the use of Ground Penetrating Radar to locate services underground
Excavation Permit is an authority to perform excavation works at or near the site.
BYDA – Before You Dig Australia is national records system for underground services
Excavation Inspections: Monitoring activities completed to ensure ongoing safety of the excavation activities
Project Risk Assessment
Ensure Excavation has been identified within the Project Risk Assessment. The Project Risk Assessment shall be used to develop safe systems of work associated with:
- High Risk Construction Work (HRCW) – Excavation > 1.5m;
- General Excavation;
- Excavation adjacent to structures and services;
- Excavation near above ground and underground services (including liaising with asset owners);
- Mobile plant working in or around an excavation;
- Potential falls into the excavation;
- Ground penetration works; and
- Non-destructive digging.
Safe systems of work to control excavation activities include the development of Permits, SWMS, drawings/plans, engineering reports or a combination of these in accordance with the below requirements.
Excavation Workshop
Hindmarsh shall conduct the Excavation Workshop with the nominated contractor representative prior to commencing excavation activities on site.
Only persons who have attended the Workshop are authorised to complete an Excavation Permit. The Workshop shall be completed to assist in ensuring:
- the requirements of the Excavation Permit are understood and applied correctly
- there is a thorough understanding of and investigation into services that may be present in the dig site
Once the initial workshop has been completed the Workshop is not required again unless the contractor representative completing Excavation Permits changes.
If the excavation works involves bulk excavation (i.e. site civil works or piling) the Civil Works and Piling Workshop is also required to be completed.
Civil / Piling Workshop
Hindmarsh shall conduct the Civil and Piling Workshop and the Excavation Workshop with the nominated contractor prior to commencing activities on site and to develop safe systems of work for the:
- bulk excavation of the site;
- location of services, piling and anchoring;
- positioning and ground conditions for placement of piling rig;
- understanding of Geotechnical Engineer requirements for the site
- correct installation of systems/structures, including the ongoing monitoring of the effectiveness of the systems/structures in accordance with legislative and manufactures requirements and applicable drawings or plans.
Once the initial workshop has been completed the Civil and Piling Workshop is not required again unless the civil / piling works contractor changes.
Identification and Location of Services
To assist with services identification and location contact Before You Dig Australia (BYDA) visit their website byda.com.au.
Allow at least three days from enquiry submission to receive all your BYDA information as this information is required to complete the Excavation Permit.
The Services Interference Request may be used when working in a client or other entities workplace in accordance with the Project Risk Assessment.
Print all received plans including your BYDA Enquiry Confirmation Sheet that contains the BYDA Confirmation Number. Printed plans shall be maintained on site for the duration of the excavation activity. BYDA plans have an expiry date that can be found on the BYDA Enquiry Confirmation Sheet. A new BYDA enquiry shall be made when excavation activities exceed the expiry date.
All services must be positively identified, with the depth known and position marked accordingly by using services locators, non-destructive digging (aqua-vac) and or hand excavated to confirm service location. Do not perform ground penetrating actions unless services (specifically in road and footpath areas) are positively identified.
Excavation Permit Requirements
An Excavation Permit shall be completed for all excavations, except as noted below, prior to commencing works. The permit shall address the nature of the works and methods to prevent ground collapse. Drawings, plans and engineering reports relevant to the excavation activity shall be referenced on the permit and maintained on site for reference.
Permit exemption – Excavation Permits are not required for:
- ground penetration works; or
- exploratory non-destructive excavation.
For ground penetrating works and exploratory non-destructive excavation, any instructions (i.e. equipment maximum nozzle pressures etc) from Asset owners and BYDA must be implemented and available on site for reference.
Excavation Support Systems
Excavation support systems including hydraulic shoring, sheet piling, trench lining and ground anchors shall be:
- designed by a qualified Geotechnical or Structural Engineer;
- detailed on current drawings;
- installed in accordance with documented designs/drawings and verified by persons trained and instructed in the support system being installed; and
- authorised by a qualified Geotechnical or Structural Engineer where changes to the design or installed system are made.
Modular shoring systems including trench shields and boxes shall be:
- designed by a qualified Geotechnical or Structural Engineer;
- detailed on current drawings; and
- installed in accordance with documented designs/drawings and verified by persons that have received specific instruction or are experienced in the specific certified shoring system being used.
Excavation Inspections
Only excavations >1.5m shall be inspected as specified in the Excavation Permit. Excavations >1.5m shall be inspected prior to entry of persons into the excavation.
Excavation/Trench Inspector – a person with industry approved qualifications (i.e. Geotechnical Engineer)/training and instruction in Excavation inspections/or has completed the Hindmarsh Excavation and Trenching Awareness training.
Excavation activities shall be monitored through Weekly SQE Inspection and SWMS Engagement activities.
Emergency Procedures
Safety documentation (e.g. SWMS, Plans, Procedures) shall address task specific emergency procedures and meet the minimum requirements of Hindmarsh Emergency Management Plan – Excavation Standing Orders. Procedures shall be documented and communicated to workers and evidenced with sign off. Where a Subcontractor cannot provide suitable procedures, the Emergency Procedures tab within the Excavation Permit shall be used.