Formwork
Risks associated with structural support systems and temporary structures are identified, assessed and controlled in accordance with the hierarchy of controls and the Project Risk Assessment.
Key Points

Formwork Flowchart
The Flowchart – Formwork is available as a guide to managing key formwork activities on site and developing safe systems of work in accordance with the below requirements.
Project Risk Assessment
Project specific Formwork activities shall be identified, assessed and controlled in accordance with the Project Risk Assessment that is used to assist in the development of safe systems of work.
Formwork Workshop
Hindmarsh shall conduct the Formwork Workshop with the nominated contractor prior to commencing activities on site and to develop safe systems of work for the:
- erection, use and stripping of formwork;
- prevention of persons falling and the management of falling objects;
- management of penetrations (Open penetrations such as stairwells shall include handrails, mesh and plywood covers. Slab shall include cast in mesh to be secured prior to pouring concrete. Penetrations on poured slabs shall be covered with form play and secured in place to prevent inadvertent removal); and
- correct installation of systems/structures, including the ongoing monitoring of the effectiveness of the systems/structures in accordance with legislative and manufactures requirements and applicable drawings or plans.
Once the initial workshop has been completed the Formwork Workshop is not required again unless the formwork supplier/installer changes.
Structural Supports
Structural support systems including formwork, falsework, edge protection, propping and other structural support systems and the structure, material and foundations that the formwork shall be erected on shall:
- be designed by a Structural Engineer with experience in structural support systems;
- be detailed on up-to-date drawings;
- have changes to the design or installed system approved by the Structural Engineer.
Evidence of the initial inspection and handover certificate shall be conducted by a Ticketed Scaffolder, or a Rigger, or a worker trained in the use of the system, documented and provided to Hindmarsh.
Ongoing inspections of installed systems shall be conducted monthly by a Ticketed Scaffolder, or a Rigger, or a worker trained in the use of the system, documented and provided to Hindmarsh.
Inspection and Monitoring
The following inspections are required during Formwork Activities:
1. The HCA QAC ITC Tempate Concrete Pour shall be completed in stages during concrete pour process:
- Documentation Check shall ensure that all documentation required is approved and complete
- Initial Inspections shall ensure that ITPs etc have been received and internal inspections of reinforcing / post tensioning / cast in has been completed
- Final Inspection before Pour shall ensure that Engineers inspections have been completed and actions required verified as completed via the Formwork Installation Checklist, and deck conditions are correct for the pour to proceed including cast ins installed, penetration blockouts installed and safety mesh installed as required.
- Execution of Pour shall ensure that the pour is able to proceed on the day booked in
- Initial Post Pour Inspections shall ensure that subsequent activities and inspections are booked in and carried out as required
2. The Formwork Installation Checklist to be completed by Hindmarsh in consultation with the formwork contractor prior to concrete pours any actions required from the engineers must be noted and signed off as required.;
3. The Formwork Stripping Checklist to be completed by Hindmarsh in consultation with the formwork contractor, prior to formwork stripping the relevant supervisors must walk through the zone and ensure that the scope of stripping is aligned with any engineers advice.
The Weekly SQE Inspection and SWMS Engagement shall be used by Hindmarsh to monitor formwork throughout the project.