High Risk Construction Work

High risk construction work shall be managed in accordance with the Project Risk Assessment and the following HRCW activities.  Works deemed High Risk must be accompanied by a SWMS in accordance with Action Steps below.

Safe Work Method Statements

The Project Risk Assessment shall be used to inform Hindmarsh and Subcontractors of the potential hazards and minimum controls required to manage related activities.  Safe Work Method Statements (SWMS) shall be developed and approved for high-risk construction work.  Hindmarsh SWMS shall be documented on the Safe Work Method Statements (SWMS).

Subcontractor SWMS shall be reviewed and accepted by Hindmarsh via the SWMS Review form (preferably electronically via the Hammertech SWMS Module on projects that can access this or via the paper document) prior to works commencing on site.

SWMS shall be filed on site or electronically via Hammertech and either tracked via OnSite SQE Activities or collaboration tool (e.g. Aconex).

The Weekly SQE Inspection and SWMS Engagement shall be used to monitor that works are undertaken in accordance with SWMS.

 

High Risk Construction Work – Legislative

High Risk Construction Work (HRCW) types are defined in the WHS Legislation applicable to all jurisdictions that HCA operates in. HCA has further defined these are Standard HRCW and Non-Standard HRCW. This is reflected in the Project Risk Assessment. HCA has made this distinction due to the type of works we are mostly involved in, with Standard HRCW being the HRCW that HCA is involved in consistently.

Standard HRCW:

  • Asbestos
  • Confined Space
  • Contaminated / Flammable Atmosphere (eg Silica, Asbestos)
  • Demolition
  • Electrical
  • Excavation
  • Health Surveillance, Exposure Monitoring, Hazardous Substance
  • Mobile Plant
  • Temporary Support Structures (see; Concreting, Formwork, Precast, Scaffold, Structural Steel)
  • Tilt Up/Precast Concrete
  • Traffic (Public Road, Traffic Management, Rail Corridor)
  • Working at Heights

Non-Standard HRCW:

  • Artificial Extremes of Temperature
  • Chemical, Fuel or Refrigerant Lines
  • Construction Work In, Over or Adjacent to Water / Liquids where risk of Drowning
  • Diving
  • Pressurised Gas
  • Telecommunication Towers
  • Tunnels

If a Non-Standard HRCW is identified as applicable to a project, safe systems of work (e.g. SWMS, procedures) to be developed in accordance with OFSC Audit Criteria Guidelines and Project Risk Assessment ‘Tab 3 – Risk Assessment and Control’ in consultation with SQE Manager

High Risk Construction Work – Trades

These are trades that are not wholly within a HRCW category above, however, HRCW comprise of a large portion of their works. HCA has determined that these trades require their own processes to ensure safe systems of work as there are required controls over and above the controls contained in the applicable Standard HRCW Action Steps.

HRCW Trades that HCA has identified are:

  • Formwork (Temporary Support Structures, Working at Heights, Mobile Plant)
  • Scaffold (Temporary Support Structures, Working at Height)
  • Structural Steel (Working at Height, Mobile Plant, Temporary Support Structures)
  • Modular Loading Bays (Working at Height, Mobile Plant, Temporary Support Structures)

Exclusion Zones

Exclusion zones for all HRCW and General Hazards shall be addressed according to Technical Guidance Note – Exclusion Zones

Hand Protection

Use of Hand Protection for all HRCW and General Hazards shall be addressed according to Technical Guidance Note – Hand Protection and supplementary poster Poster – Hand Protection

Access and Egress

Access and Egress requirements for all HRCW and general guidance shall be addressed according toTechnical Guidance Note – Access and Egress