Scaffold

Scaffold

Risks associated with Scaffold shall be assessed identified, assessed and controlled in accordance with the with following Action Steps and the Project Risk Assessment.

Key Points

Scaffold Flowchart

The Flowchart – Scaffold is available as a guide to managing key scaffold activities on site and develop safe systems of work in accordance with the below requirements.

Project Risk Assessment

Project specific Scaffold activities shall be identified, assessed and controlled in accordance withe the Project Risk Assessment. The Project Risk Assessment shall be used to assist in the development of safe systems of work.

Scaffold Workshop

Hindmarsh shall conduct the Scaffold Workshop to develop safe systems of work for the erection, use and stripping of scaffolding >4m with the relevant contractor prior to commencing activities on site.  Once the initial workshop has been completed the Scaffold Workshop is not required unless the scaffold supplier or erection subcontractor changes.

Scaffold Design >4m

The scaffold designer shall:

  • Be a qualified Structural Engineer with experience in scaffold design and a member of Engineers Australia. Evidence of qualifications and competency must be kept on site;
  • provide a scaffold plan consisting of either a site layout, engineer sketch plan, engineer approved as-built or standard drawings for scaffolds >4m;
  • provide documented design parameters provided by the scaffold manufacturer. These should be located on the scaffold drawings or  associated documents; and
  • review and approve design variations that deviate in the erection from the scaffold plan or that fall outside the design parameters and/or alters the scaffold configuration.

Scaffold working deck <4m

When assembling, dismantling and re-assembling fixed or mobile scaffolds where there is a risk of fall of < 4m the Scaffold Installation Logbook shall be completed.  However if a Licensed Scaffolder is conducting the works the handover certificate and scaff tag for the scaffold is acceptable.  Work platforms with no assembly requirements (e.g. Snappy Scaffold) are exempt from this process.

Inspections and Monitoring

The Scaffold Workshop defines inspection requirements for scaffold prior to use and throughout the project including:

  • a handover certificate of the completed scaffold prior to use and uploaded as an SQE Activity; and
  • monthly checks and checks after inclement weather.

Hindmarsh shall be responsible for verifying that a complete scaffold inspection has taken place, at maximum 30 day intervals, in accordance with the workshop requirements, and that any items noted on the scaffold inspection have been rectified or the scaffold designer notified for advice/approval.  The SQE Activities Matrix shall be used to confirm the above activity.

The Weekly SQE Inspection and SWMS Engagement shall be used by Hindmarsh to monitor safe use of scaffold throughout the project.  In addition, the Scaffold Inspection Checklist may be used to conduct an on-site inspection of scaffold.  The inspection maybe triggered by management request, scaffold being adjusted without approval, Hindmarsh having reason to believe that scaffold does not meet planned requirements.

Emergency Management

Safety documentation (e.g. SWMS, Plans or Procedures) shall address project specific requirements for the erection, use and stripping of scaffold.  Documentation shall address the minimum requirements of the Hindmarsh Emergency Management Plan Standing Orders, be documented and communicated to workers and evidenced with sign off.